Bettas Road-Columbia No. 1 230 Kilovolt Transmission Line Thermal Upgrade CX(s) Applied: B4.13 Date: 05/25/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Archer KV1A Replacement Laramie County, Wyoming CX(s) Applied: B4.6 Date: 05/24/2012 Location(s): Wyoming Offices(s): Western Area Power Administration-Rocky Mountain Region
Wood Pole Replacements As Needed on the Shelton-Fairmount No. 1, 115 Kilovolt Transmission Line CX(s) Applied: B1.3 Date: 05/24/2012 Location(s): Washington, Washington Offices(s): Bonneville Power Administration
Compressed Natural Gas Fueling Facility CX(s) Applied: A1 Date: 05/24/2012 Location(s): Missouri Offices(s): National Energy Technology Laboratory
Infrastructure Upgrade of Radiation Measurement and Spectroscopy Laboratory at Missouri University of Science and Technology CX(s) Applied: B1.2 Date: 05/24/2012 Location(s): Idaho Offices(s): Idaho Operations Office
Michigan-City-Rochester Hills CX(s) Applied: A9, B2.5, B5.1 Date: 05/24/2012 Location(s): Mississippi Offices(s): Energy Efficiency and Renewable Energy
Energize Missouri Homeowners Upgrades and Geothermal Malik CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office
Energize Missouri Homeowners Upgrades and Geothermal Jura CX(s) Applied: B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office
Energize Missouri Homeowners Upgrades and Geothermal Carlson CX(s) Applied: B5.1, B5.19 Date: 05/23/2012 Location(s): Missouri Offices(s): Golden Field Office
Amendment Number 1 to the Alcoa Power Sales Agreement CX(s) Applied: A2 Date: 05/23/2012 Location(s): Oregon, Washington Offices(s): Bonneville Power Administration