Infrastructure Demolition, Replacement, and Related Activities at the Weldon Spring, Missouri, Site CX(s) Applied: B1.3, B1.7, B1.15, B1.23, B1.24, B1.26, B1.36, B3.1, B4.7 Date: 05/31/2012 Location(s): Missouri Offices(s): Legacy Management
Composite Riser for Ultra-Deepwater High Pressure Wells CX(s) Applied: A9 Date: 05/31/2012 Location(s): Nebraska Offices(s): National Energy Technology Laboratory
St. Petersburg Solar Pilot Project CX(s) Applied: B5.16 Date: 05/31/2012 Location(s): Florida Offices(s): Golden Field Office
Small Scale Electrical Power Generation from Heat Co-produced in Geothermal Fluids CX(s) Applied: A9, B3.6, B5.2, B5.15 Date: 05/31/2012 Location(s): Nevada Offices(s): Golden Field Office
Scale Resistant Heat Exchangers for Low Temperature Geothermal Binary Cycle Power Plant CX(s) Applied: A9, B5.2, B5.15 Date: 05/31/2012 Location(s): California Offices(s): Golden Field Office
Tunk Mountain Radio Station Upgrade CX(s) Applied: B1.19 Date: 05/30/2012 Location(s): Washington Offices(s): Bonneville Power Administration
Upgrade of the Secondary Containment System at Bonneville Power Administration’s (BPA) Santiam Substation CX(s) Applied: B4.6 Date: 05/30/2012 Location(s): Oregon Offices(s): Bonneville Power Administration
Install Two Pre-engineered Canopies CX(s) Applied: B1.15 Date: 05/30/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office
Puget Sound Clean Cities Petroleum Reduction Project CX(s) Applied: B5.1 Date: 05/30/2012 Location(s): Washington Offices(s): National Energy Technology Laboratory
Optimization of Microwave Telecommunication System ON Line Nevada Transmission Project, f.k.a. Southwest Intertie Project - South CX(s) Applied: B1.19, B4.6 Date: 05/29/2012 Location(s): Nevada Offices(s): Loan Guarantee Program Office