Field Testing of the Electromagnetic/Resistivity and Magnetic System in U.S. CX(s) Applied: A9, B3.1 Date: 01/15/2014 Location(s): Nevada, Nevada, Nevada Offices(s): National Energy Technology Laboratory
Office of NEPA Policy and Compliance
January 15, 2014Field Testing of the Electromagnetic/Resistivity and Magnetic System in U.S.
CX(s) Applied: A9, B3.1
Date: 01/15/2014
Location(s): Nevada, Nevada, Nevada
Offices(s): National Energy Technology Laboratory
Subtasks 3.1.3& 3.2.3- Field test of electromagnetic/resistivity and magnetic system at Nevada locale. Deploy hardware/system at surface & use existing well to test/acquire data to monitor…
CX(s) Applied: A9, B3.1
Date: 01/15/2014
Location(s): Nevada, Nevada, Nevada
Offices(s): National Energy Technology Laboratory
Subtasks 3.1.3& 3.2.3- Field test of electromagnetic/resistivity and magnetic system at Nevada locale. Deploy hardware/system at surface & use existing well to test/acquire data to monitor…