Small Scale Field Test Demonstrating Carbon Dioxide Sequestration in the Arbuckle Saline Aquifer CX(s) Applied: B1.15, B3.6, B5.2 Date: 06/04/2012 Location(s): Kansas Offices(s): National Energy Technology Laboratory
Funding for Apps for Energy Challenge CX(s) Applied: A1 Date: 06/01/2012 Location(s): CX: none Offices(s): National Energy Technology Laboratory
Cheniere Marketing, LLC CX(s) Applied: B5.7 Date: 06/01/2012 Location(s): Louisiana Offices(s): Office of Oil and Natural Gas
Coal Pile Basin Project CX(s) Applied: B1.29Date: 05/31/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Duct Chase Sprinkler Replacement Project CX(s) Applied: B1.3Date: 05/31/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
Grand Coulee-Bell No. 3 Double Circuit 230 Kilovolt Transmission Line Reconductoring Project CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Washington, Washington, Washington Offices(s): Bonneville Power Administration
Oregon City-Chemawa #2 Wood Pole Replacement Projects CX(s) Applied: B1.3 Date: 05/31/2012 Location(s): Oregon, Oregon Offices(s): Bonneville Power Administration
Dry Air Glovebox Projects CX(s) Applied: B1.31Date: 05/31/2012 Location(s): TennesseeOffices(s): Y-12 Site Office
University of Wisconsin Oshkosh Anaerobic Dry Digestion Facility CX(s) Applied: A9, B3.6, B5.20 Date: 05/31/2012 Location(s): Wisconsin Offices(s): Golden Field Office
Vegetative Response to Metal Exposure in a Growing Media CX(s) Applied: B3.6 Date: 05/31/2012 Location(s): South Carolina Offices(s): Savannah River Operations Office