Fiscal Year 2015 Snohomish District Danger Pole Replacement Project (Update to previous CX issued 4/23/15) CX(s) Applied: B4.6Date: 06/10/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Preparation and Examination of Transmission Electron Microscopy (TEM) Specimens CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Operation of ELE Permeameter CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Optimizing Use of Silver Chloride for In-situ Treatment of I-129 in Groundwater CX(s) Applied: B3.6Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Drainage Improvements East of Engineered Trench 2 Along Existing E-Area Perimeter CX(s) Applied: B1.3Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Algae Control / Maintenance of the ETP Cooling Water Basins CX(s) Applied: B1.3Date: 06/09/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
OLED Luminaire with Panel Integrated Drivers and Advanced Controls CX(s) Applied: B3.6Date: 06/09/2015 Location(s): CaliforniaOffices(s): National Energy Technology Laboratory
Understanding Influence of Thermal History and Glass Chemistry on Kinetics of Phase Separation and Crystallization in Borosilicate Glass-Ceramic Waste Forms for Aqueous Reprocessed High Level Wasate CX(s) Applied: B3.6Date: 06/09/2015 Location(s): Idah...
Experimental Validation of a Compact Double-Walled Twisted-Tube Heat Exchanger Concept CX(s) Applied: B3.6Date: 06/09/2015 Location(s): IdahoOffices(s): Nuclear Energy
Enhancement of the Extraction of Uranium from Seawater CX(s) Applied: B3.6Date: 06/09/2015 Location(s): IdahoOffices(s): Nuclear Energy