Western Groundwater Seepline and Surface Water Sampling Locations CX(s) Applied: B3.1Date: 41814 Location(s): South CarolinaOffices(s): Savannah River Operations Office
PAC-CAISO Energy Imbalance Market Agreement CX(s) Applied: B4.8 Date: 06/24/2014 Location(s): Oregon Offices(s): Bonneville Power Administration
Offsite Inspection and Repair of DOE Workover Rig #155 (PR 10090916) CX(s) Applied: B1.3 Date: 06/24/2014 Location(s): CX: none Offices(s): Strategic Petroleum Reserve Field Office
Advanced Test Reactor Primary Coolant Pump Motor Starters Replacement CX(s) Applied: B1.31 Date: 06/24/2014 Location(s): Idaho Offices(s): Nuclear Energy
PNNL Involving Siting, Modifying and Operating Support Buildings on the Hanford Site CX(s) Applied: B1.15 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
PNNL Involving Facility, Safety, and Environmental Improvements in the 300 Area CX(s) Applied: B2.5 Date: 06/24/2014 Location(s): Washington Offices(s): River Protection-Richland Operations Office
Danger Tree Management on Green Mountain-Blue Ridge Repeater 2.4-kilovolt Distribution Line (Amended), Grand County, Colorado CX(s) Applied: B1.3 Date: 06/23/2014 Location(s): Colorado Offices(s): Western Area Power Administration-Rocky Mountain Region
Orange County Solar Demonstration and Research Facility CX(s) Applied: A9, B5.16 Date: 06/23/2014 Location(s): Florida Offices(s): Golden Field Office
Nanostructured Silica Sorbent for Carbon Capture CX(s) Applied: B3.6 Date: 06/23/2014 Location(s): Delaware Offices(s): National Energy Technology Laboratory
Vertically Aligned Carbon-Nanotubes Embedded in Ceramic Matrices for Hot Electrode Applications CX(s) Applied: B3.6 Date: 06/23/2014 Location(s): Nebraska Offices(s): National Energy Technology Laboratory