Concertina Wire Installation at Liberty Substation CX(s) Applied: B1.11Date: 04/21/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Office of NEPA Policy and Compliance
April 21, 2016Concertina Wire Installation at Liberty Substation
CX(s) Applied: B1.11
Date: 04/21/2016
Location(s): Arizona
Offices(s): Western Area Power Administration-Desert Southwest Region
Based on the results of an Inspector General (IG) audit, Western plans to add constantine wire to the top of the existing perimeter fence surrounding Liberty Substation (~5,272 feet).