MRCSP Phase III Task 1.6 Hray-Mullenax #1 Characterization CX(s) Applied: A9, B3.1Date: 01/06/2015 Location(s): OhioOffices(s): National Energy Technology Laboratory
Rattlesnake Butte Phase 3 Property Funding CX(s) Applied: B1.25Date: 01/06/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Chemawa Substation Equipment Acquisition CX(s) Applied: B1.7Date: 01/06/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Replace Buckling Tower 1/9 on the Raymond-Henkle Street Number 1 Line CX(s) Applied: B4.13Date: 01/06/2015 Location(s): WashingtonOffices(s): Bonneville Power Administration
Replacement of the 254-13H Safety Significant (SS) Standby Diesel Generator CX(s) Applied: B2.5Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Boric Acid Modification of Zeolite Molecular Sieve CX(s) Applied: B3.6Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Work in the 723-A High Pressure Laboratory CX(s) Applied: B3.6Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Development and Testing of Reactive Amendment Saltstone CX(s) Applied: B3.6Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 707-7F CX(s) Applied: B1.3Date: 01/05/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Medicine Bow Substation Control Building Installation Project (Amended) Carbon County, Wyoming CX(s) Applied: B4.11Date: 01/05/2015 Location(s): WyomingOffices(s): Western Area Power Administration-Rocky Mountain Region