CX-015623: Categorical Exclusion Determination

Computer Network Connection for the Advanced Test Reactor Critical (ATR-C) Facility CX(s) Applied: B1.7Date: 07/27/2016 Location(s): IdahoOffices(s): Nuclear Energy

Office of NEPA Policy and Compliance

July 27, 2016
Estimated Read Time   min

Computer Network Connection for the Advanced Test Reactor Critical (ATR-C) Facility
CX(s) Applied: B1.7
Date: 07/27/2016
Location(s): Idaho
Offices(s): Nuclear Energy

The proposed activity would install a computer network connection in the Advanced Test Reactor Critical (ATR-C) Facility by running conduit from the west side office area near the entry into ATR-C and pulling in four category 5E (Cat5E) cables.