Anaconda Substation Control House Floor Asbestos Abatement CX(s) Applied: B1.16Date: 04/25/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Curecanti Crystal 115 Kilovolt Transmission Line Vegetation Management Task Order No. 103 Herbicide Treatment Montrose County CX(s) Applied: B1.3Date: 04/22/2016 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mountain Region
Echo Lake-Maple Valley No.1 Footing Repair Project: Structure 10/2 CX(s) Applied: B1.3Date: 04/22/2016 Location(s): WashingtonOffices(s): Bonneville Power Administration
Jocko Hollow Property Acquisition Funding CX(s) Applied: B1.25Date: 04/22/2016 Location(s): MontanaOffices(s): Bonneville Power Administration
Hat Rock Substation Upgrades CX(s) Applied: B4.1Date: 04/22/2016 Location(s): OregonOffices(s): Bonneville Power Administration
Categorical Exclusion Determination
Categorical Exclusion Determination
Categorical Exclusion Determination
Concertina Wire Installation at Liberty Substation CX(s) Applied: B1.11Date: 04/21/2016 Location(s): ArizonaOffices(s): Western Area Power Administration-Desert Southwest Region
Categorical Exclusion Determination