PXP-15-0004 Safety, Health, and Environmental Improvements for Fiscal Year 2016 and 2017 CX(s) Applied: B2.1, B2.2, B2.3, B2.5Date: 08/12/2015 Location(s): TexasOffices(s): Pantex Site Office
Automated TERRA Phenotyping System for Genetic Improvement of Energy Crops CX(s) Applied: B3.6Date: 08/12/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
A Transient Reactor Physics Experiment with High-Fidelity, 3-D Flux Measurements for Validation and Verification - Kansas State University CX(s) Applied: B3.6Date: 08/12/2015 Location(s): IdahoOffices(s): Nuclear Energy
Bayou Choctaw Wi-Fi/Radio Replacement Pilot CX(s) Applied: B1.7Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Install Packaged Central Heating, Ventilation and Air Conditioning Units for Bayou Choctaw Building 423 CX(s) Applied: B1.4Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Replace Big Hill Critical Loop Transformers & Cables Damaged by Hurricane Ike CX(s) Applied: B1.3Date: 08/12/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Plasma Accelerator on the Swarthmore Spheromak Experiment CX(s) Applied: B3.6Date: 08/12/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Demonstrating Fuel Magnetization and Laser Heating Tools for Low-Cost Fusion Energy CX(s) Applied: B3.6Date: 08/12/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Slatt Substation Restroom Installation CX(s) Applied: B4.6Date: 08/12/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Engineering Thermophiles to Produce Drop-In Biofuels from Syngas Award Number: DE-EE0007008 CX(s) Applied: A9, B3.6 Bioenergy Technologies Office Date: 08/12/2015 Location(s): CA Office(s): Golden Field Office