Subsea Produced Water Sensor Development CX(s) Applied: A9, A11, B3.6Date: 09/29/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Hydraulic Fracturing Test Site CX(s) Applied: A9, B3.1, B3.7Date: 09/29/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Big Eddy-Redmond #1 Wood Pole Replacement (Part 2) CX(s) Applied: B1.3Date: 09/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Umatilla Electric Cooperative Solar Interconnection CX(s) Applied: B1.7Date: 09/28/2015 Location(s): OregonOffices(s): Bonneville Power Administration
Dredging of Bryan Mound Raw Water Intake Structure Inlet Channel CX(s) Applied: B1.3Date: 09/28/2015 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office
Design/Build Kroll Room Upgrade Project CX(s) Applied: B1.7, B1.31Date: 09/28/2015 Location(s): OregonOffices(s): National Energy Technology Laboratory
Efficient Capacitive Wireless Power Transfer System for Electric Vehicles CX(s) Applied: B3.6Date: 09/25/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Spark-Assisted HCCI Residential Generator CX(s) Applied: B3.6Date: 09/25/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Oscillating Linear Engine and Alternator CX(s) Applied: B3.6Date: 09/25/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Extension of Existing License for Greenhouses Located in Davis, California CX(s) Applied: B1.24, B3.6Date: 09/25/2015 Location(s): CaliforniaOffices(s): Berkeley Site Office