1 Kilowatt Recuperated Brayton-Cycle Engine Using Positive-Displacement Components CX(s) Applied: B3.6Date: 10/14/2015 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Multiple Degradation Mechanisms in Reinforced Concrete Structures, Modeling and Risk Analysis - The University of Houston CX(s) Applied: B3.6Date: 10/14/2015 Location(s): IdahoOffices(s): Nuclear Energy
CHPRC Installation or Relocation of Machinery and Equipment CX(s) Applied: B1.31Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Asbestos Removal CX(s) Applied: B1.16Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Routine Maintenance CX(s) Applied: B1.3Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
CHPRC Cleanup Actions CX(s) Applied: B6.1Date: 10/14/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Bear Spring Microwave Site Firebreak Clearing CX(s) Applied: A12, B1.3, B2.5, B4.11Date: 10/13/2015 Location(s): CaliforniaOffices(s): Western Area Power Administration-Sierra Nevada Region
NREL – Power to Gas Pilot Skid Project; NREL Tracking No. 15-017 Award Number: DE-AC36-08GO28308 CX(s) Applied: B3.6, DOE/EA-1968 National Renewable Energy Laboratory (NREL) Date: 10/13/2015 Location(s): CO Office(s): Golden Field Office
DWPF Process Simulation CX(s) Applied: B3.6Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
151-1L Substation/switchgear Replacement CX(s) Applied: B1.3Date: 10/13/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office