N-Area Trailers and Handi-Houses Demolition and Removal CX(s) Applied: B1.23Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Nalco Chemistry Control System in 241-98H CX(s) Applied: B1.5Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-51E CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-55H CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-L CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New Heating, Ventilation, and Air Conditioning System for L-Area Disassembly CX(s) Applied: B2.1Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install New Electric Gate and Controls at Building 645-1N CX(s) Applied: B1.3Date: 08/24/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
CX-270255: Research and Education Campus (REC) Fiscal Year (FY) 2016 Through FY2017 Interior Updates
Categorical Exclusion Determination
Development of the CSX Centrifugal Contractor System for Large-scale Solvent Extraction Applications in the Mining and Metals Industry CX(s) Applied: B3.6Date: 08/24/2016 Location(s): IllinoisOffices(s): Argonne Site Office
Automatic ultrasonic testing (AUT) Survey for 48 inch Big Hill (BH) Brine Disposal Pipeline CX(s) Applied: B1.3Date: 08/24/2016 Location(s): TexasOffices(s): Strategic Petroleum Reserve Field Office