Radionuclide Release Testing with Actual Waste Samples CX(s) Applied: B3.6Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 705-N CX(s) Applied: B1.3Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 234-H CX(s) Applied: B1.3Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Install Hurricane Shutters on 735-B Alternate EOC Room Windows CX(s) Applied: B2.5Date: 12/29/2015 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Project L-840: Export Water Line Replacement, 2901Y to 200W CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
Project L-525: 24-inch Export Water Line Installation, 2901Y to 200E CX(s) Applied: B5.5Date: 12/29/2015 Location(s): WashingtonOffices(s): River Protection-Richland Operations Office
On site Use of UASs for Research Applications and Site Inspections CX(s) Applied: B3.2Date: 12/24/2015 Location(s): IllinoisOffices(s): Argonne Site Office
Deepwater Methane Hydrate Characterization and Scientific Assessment CX(s) Applied: A9, B3.6Date: 12/24/2015 Location(s): TexasOffices(s): National Energy Technology Laboratory
Cellular Cofferdams for Hydropower Use Award Number: DE-EE0007245 CX(s) Applied: A9 Water Power Program Date: 12/23/15 Location(s): CO Office(s): Golden Field Office
Sustainable and Holistic Integration of Energy Storage and Solar PV (SHINES) Award Number: DE-EE0007177 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Date: 12/23/15 Location(s): TX Office(s): Golden Field Office