284-H Battery Room Relocation CX(s) Applied: B1.15, B1.23Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 704-1N CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Roof Repairs at 703-41A CX(s) Applied: B1.3Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Technetium Sorption and Retention Testing - LDRD CX(s) Applied: B3.6Date: 03/25/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Substation Maintenance and Renovation Activities for 2016-2017 CX(s) Applied: B1.3Date: 03/25/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-Desert Southwest Region
Protection and Communication Facilities Maintenance and Minor Additions or Modifications to Existing Infrastructure 2016-2017 CX(s) Applied: B1.3, B1.7, B1.19Date: 03/25/2016 Location(s): Multiple LocationsOffices(s): Western Area Power Administration-...
A Smart and Flexible Microgrid with a Low-Cost Scalable Open-Source Controller CX(s) Applied: B3.6Date: 03/24/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
Transitioning Advanced Ceramic Electrolytes into Manufacturable Solid-State EV Batteries CX(s) Applied: B3.6Date: 03/24/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy
RACEE Phase Two Technical Assistance Delivery Award Number: DE-EE0007352 CX(s) Applied: A9, A11 Office of Strategic Programs Date: 03/24/2016 Location(s): AK Office(s): Golden Field Office
High Performance Power-Grid Optimization CX(s) Applied: A9Date: 03/24/2016 Location(s): Multiple LocationsOffices(s): Advanced Research Projects Agency-Energy