Big Hill Remote Control for Pipeline Valve BH-3 CX(s) Applied: B1.3Date: 03/01/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
API 653 Inspection of BMT-2 Prior to Conversion CX(s) Applied: B1.3Date: 03/01/2016 Location(s): Multiple LocationsOffices(s): Strategic Petroleum Reserve Field Office
Combined Photovoltaic/Battery Grid Integration with High Frequency Magnetics Enabled Power CX(s) Applied: B5.15Date: 03/01/2016 Location(s): PennsylvaniaOffices(s): National Energy Technology Laboratory
Livermore Site Heating, Ventilation and Air Conditioning Modernization CX(s) Applied: B1.3, B1.4, B1.11Date: 02/29/2016 Location(s): CaliforniaOffices(s): Lawrence Livermore Site Office
Construction and Operations of Building 276, Security Fitness and Training Center Replacement Facility CX(s) Applied: B1.15, B1.23Date: 02/29/2016 Location(s): CaliforniaOffices(s): Lawrence Livermore Site Office
Low-Pressure Development Combustor CX(s) Applied: B3.6Date: 02/29/2016 Location(s): West VirginiaOffices(s): National Energy Technology Laboratory
Federal Prison Photovoltaic System Project Award Number: DE-EE0006620 CX(s) Applied: A9 Federal Energy Management Program Date: 08/06/2014 Location(s): DC Office(s): Golden Field Office
Microturbine Applications for Distributed Cogeneration at NSF-Sponsored Facilities in the Arctic Award Number: DE-FOA-0901-1648 CX(s) Applied: A9 Federal Energy Management Program Date: 08/06/2014 Location(s): CO Office(s): Golden Field Office
Wide Bandgap Chalcopyrite Photoelectrodes for Direct Solar Water Splitting Award Number: DE-EE0006670 CX(s) Applied: B3.6 Fuel Cell Technologies Office Date: 08/06/2014 Location(s): HI Office(s): Golden Field Office
Demonstration of Smart Grid Ready Inverters with Utility Communication Award Number: DE-EE0005337 CX(s) Applied: A9, B5.16 Solar Energy Technologies Office Date: 08/06/2014 Location(s): TN Office(s): Golden Field Office