Integrated Plastic Substrates for Organic Light Emitting Diode Lighting CX(s) Applied: B3.6Date: 42522 Location(s): OregonOffices(s): National Energy Technology Laboratory
Estes - Pole Hill, Flatiron - Pole Hill, and Estes - Lyons 115 Kilovolt Transmission Lines Vegetation Management Larimer County, Colorado CX(s) Applied: B1.4Date: 06/01/2016 Location(s): ColoradoOffices(s): Western Area Power Administration-Rocky Mount...
Holometer Reconfiguration CX(s) Applied: B1.15Date: 42521 Location(s): IllinoisOffices(s): Fermi Site Office
Enhanced Sorption of Metals on Humate Amended Soil CX(s) Applied: B3.6Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Moxee Substation Equipment Upgrades CX(s) Applied: B4.11Date: 42521 Location(s): WashingtonOffices(s): Bonneville Power Administration
Characterization of Plutonium Oxide CX(s) Applied: B3.6Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Subcontractor Will Provide Roof Repairs at 701-3H CX(s) Applied: B1.3Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Installation of Trench Drain and Maintenance Repairs at 773-52A CX(s) Applied: B1.3Date: 05/31/2016 Location(s): South CarolinaOffices(s): Savannah River Operations Office
Advanced Test Reactor Loop Pump and Ancillary Equipment Replacement CX(s) Applied: B1.31Date: 42521 Location(s): IdahoOffices(s): Nuclear Energy
Big Eddy-Chenoweth, Chenoweth-Goldendale Transmission Line Wood Pole Replacements and Access Road Maintenance CX(s) Applied: B1.3Date: 42517 Location(s): WashingtonOffices(s): Bonneville Power Administration