The Unlocking Lasting Transformative Resiliency Advances by Faster Actuation of power Semiconductor Technologies (ULTRAFAST) program seeks to devel…
This Amended Determination follows the approval of additional funds and period of performance to support the project's small-scale research and dev…
Substation construction/upgrades and electrical distribution lines upgrades. …
This project would install up to 300 electric EV charging stations at various parking locations at the Nevada National Security Site (NNSS), the No…
Mission Support and Test Services, LLC (MSTS), a contractor to the National Nuclear Security Administration (NNSA), would lease an office in Washin…
Surveys, data collection, and monitoring would be conducted at project locations at the Nevada National Security Site (NNSS), Nellis Air Force Base…
The U.S. Department of Energy (DOE) is proposing to provide funding to the Pacific Ocean Energy Trust (POET) to administer the Testing and Access f…
Laboratory testing of produced water samples, recovery of rare earth elements and other valuable minerals, biological treatment of water specimens,…
Upgrade Autotransformer components in existing substation, Replace distribution transformers in existing substation, and install 400 Tripsaver devi…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon (CTWS) to replace the aging roof of the DeWitt Homestead. Th…