Collection of acid mine drainage water to the Morris Number 2 Active Treatment Plant site operated by PA DEP. It is anticipated that up to 4 sample…
Project Management, Material Inventory and Analysis, LIBS Laboratory Testing, ML Modeling and Validation, Pilot-Scale testing in Fluidized Bed and …
The project conducts Raman and Laser-Induced Breakdown Spectroscopy experiments, develops prototype distributed laser sensing applications, and exp…
This EEC covers various general renovations for Building 723-A, such as flooring/cove base replacement, ceiling tile replacement, painting, and ele…
The existing underground feeder 2-2 (13.8Kv) failed at 151-1L and will be replaced. The PILC cable that has failed was the original cable 70 years …
The Scope of Work details the extraction of asphalt core samples from multiple locations along Road 8 to support SIE (Site Infrastructure Engineeri…
The work scope involves the extraction of three (3) different asphalt core samples, taken at random location along Road G. These samples will be us…
The work scope involves the extraction of asphalt core samples from multiple locations in F-Area to support the widening of the roads to support ad…
Installation of Wi-Fi in 723-A.…
Relocation of IWW Outfall H-07 and install an access road south of building 772-H, near current H-07 Outfall location.…