The Sylvania electrical system would like to replace all existing three phase poles that are failing within the electrical system. Over 90 percent…
The current infrastructure is 3.9 miles of overhead copper wires with 95 poles. This infrastructure was installed in the 1970s and is outdated. T…
The Rinaker-Palmyra Tie Line Project includes right-of-way vegetation clearing along new and existing easements, as well as construction and instal…
BPA is responding to a request from the City of Vancouver to dispose of approximately 1.4 acres of BPA fee-owned property in the North Bonneville-R…
BPA is responding to a request from the City of Vancouver to partially dispose of about 0.4 acres of BPA fee-owned property on the North Bonneville…
BPA proposes to remedy impairments, add overhead ground wire (OHGW), and improve access roads along the Libby-Bonners Ferry No. 1 transmission line…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management between structures 6 to13 …
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Eastman Chemical Company in support of Phase 1 of the Advance…
DOE's Office of Clean Energy Demonstrations (OCED) is proposing to provide funding to Alutiiq Tribe of Old Harbor in support of Phase 1 of the Old …
Fire Alarm Replacement at 736-A.…