Select, synthesize, and characterize tailored solid adsorbents for computational modeling, bi-layer laminated structures development, process simul…
BPA Task Order for Phase O Outreach and Assistance Program for the Office of Science. Small Business Innovation Research/Small Business Technology …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace the entrance gate at the Cody Service Center in Park Cou…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve a request by Tri-State Generation and Transmission Assoc…
Award Number: DE-EE0008753 CX(s) Applied: A9, B3.6 Solar Energy Technologies Office Location(s): OH Office(s): Golden Field Office
This proposed activity will remove additional insulation from the 150 pound steam to trap to allow for leak repairs.…
This proposed activity will regasket a drop jumper in the Canyon Building. The gasket is assumed to be asbestos containing material.…
The partial closure of the F-Area Inactive Process Sewer Line (FIPSL) Treblers (904-108G and 904-47G).…
Boiler preventive and corrective maintenance (PM/CM) on 735-1B Hot Water System, including removal of presumed asbestos containing material (PACM) …
The existing cubicles are original to the 730-B facility and have reached the end of their design life and will be replaced.…