Transport, Receipt, and Unloading of Samples from VC Summer. Rev. 2 Added returning samples to glass vials, where the vials will be subsampled usi…
The proposed action is to fully remove the existing roof system on building 292-F, Fan House, down to the existing metal deck and replace it. …
This CX is for the procurement of government property for the LE-2 CD-3C projects. The environmental impacts of the construction of the projects i…
2 HVAC units with excessive service calls past their expected life cycle will be replaced with better up to date equipment.…
Remove 8 small hotel unit HVACs, replace with DOAS system or similar via design build.…
Replace Valves V-36, V-152, V-87 and V-406 on Steam System. Valves V-36, V-87, and V-406 will also include replacement of presumed asbestos contai…
Subcontractor will provide roof repairs at Building 246-2H. The Subcontractor will disturb the existing roof while performing these repairs.…
TDA will develop a new sorbent system for post-combustion CO2 capture and conduct lab and bench-scale testing at TDA. Then, they will conduct field…
Unit needs resized/replaced.…
Subcontractor shall furnish paints and thinners to the four SPR sites for a 3 year period (2019-2021). All paints and thinners are to be in one gal…