Paint interior Room(s) (304) in Building 730-1B. Replace one ceiling tile. Replace wall hangings as directed. Repair any sheetrock damage.…
Excavate and Repair Underground Domestic Water leak near Building 735-A. It is suspected a fitting or pipe split due to normal wear and tear and a…
The G-Area Oil Seepage Basin is located southeast of N-Area and is approximately 150 feet long and 95 feet wide. The depth of the basin ranges from…
Idaho National Laboratory conducts irradiation experiments in the Transient Reactor Test Facility for the purpose of assessing the performance of i…
Sterile/triploid grass carp will be stocked into Lake Billy Shaw for biological control of dense aquatic vegetation (milfoil) that is degrading and…
Categorical Exclusion Determination
DOE at the Paducah Gaseous Diffusion Plant (PGDP) plans to design and construct a new electrical distribution system to bypass the C-531 Switchyard.
To comply with the National Electric Safety Code, Western States Coordinating Council and Western Area Power Administration directives for protecti…
Categorical Exclusion Determination
Categorical Exclusion Determination