QuesTek will lead the overall STTR program with the long-term objective to design and fabricate a functionally graded material (FGM) component, joi…
The DOE Office of Science is the sole source of support for this project. Sealed Optics Company, Inc. proposes a novel method of joining materials …
The preliminary scope of the project includes the design, construction, and start-up of a facility of 38,000 to 45,000 GSF in a two to three story…
Award Number: DE-EE0008739, CX(s) Applied: A9, B3.6, Solar Energy Technologies Office, Location(s): TX, Office(s): Golden Field Office
Award Number: DE-EE0008781, CX(s) Applied: A9, Water Power Technologies Office, Location(s): MO, Office(s): Golden Field Office
BPA proposes to acquire a conservation easement to be granted by the Washington Department of Natural Resources (WDNR) on 40 acres in King County, …
DOE LM is proposing to install aerial survey quality control monuments for future aerial survey activities at the Shirley Basin South, disposal sit…
The scope of this task will replace the diesel engine and generator and consolidate and/or replace the existing 4 Motor Control Centers (MCCs) in R…
Prep and paint pump skid at Waste Solidification Building (WSB).…
Five office trailers, one bathroom trailer and one handi-house in L-Area will be removed and replaced.…