Two plastic 3D printers will be operated inside 723-15A.…
The proposed activity of this EC comprises two connected actions: • Replace several aging components of the ATR primary coolant system (PCS), and •…
This revision addresses two changes: 1) The categorical exclusion covering this activity was changed from B2.5 "Facility Safety and Environmental I…
Award Number: DE-EE0008902, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): NM, Office(s): Golden Field Office
Award Number: DE-EE0008917, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): UT, Office(s): Golden Field Office
Proposed activity will reconfigure and remodel 226-2F to support use as a training and operations support facility.…
This activity is to prepare and relocate various equipment from the MCA to off-site and on-site recipients.…
Relocate chiller to new location, inside Temporary Construction Opening (TCO) across from B209 inside Building 226-F.…
The subcontractor shall provide all material, labor, supervision, tools, transportation, lodging and test equipment for obtaining pressurized and u…
BPA proposes to replace deteriorating wood pole structures and associated structural/electrical components (e.g. cross arms, insulators, guy anchor…