Wash/clean, caulk, and repaint Trailer 704-74F.…
A leak has occurred on the piping of the Neutralization System at 723-A. The piping and Pump-001 will be replaced. Gaskets at flanges are PACM (Pre…
The purpose of F-DCF-H-00743 is to create an “Electrical Airgap” between Buildings 234-H and 236-H. Fire alarm and detection equipment within Build…
Troubleshoot and repair Heating Water Circulating Pump #006 in Building 735-1B.…
Replace Valve SCW-V-4501 at K-Area Assembly Area and associated insulation.…
Painting the exterior of Building 701-1L.…
LM is proposing to install fence flagging as a wildlife habitat improvement at the Gunnison site. The proposed action is intended to enhance wildli…
The U.S. Department of Energy, Richland Operations Office, Infrastructure and Services Division proposes to remove and reroute portions of the 100 …
The Western Area Power Administration (WAPA) is proposing to replace insulators at Structures 92/1 - 92/3 on the Glen Canyon (GC) - Flagstaff (FLG)…
Award Number: DE-EE0008793, CX(s) Applied: A9, A11, Geothermal Technologies Office, Location(s): OR, Office(s): Golden Field Office