The scope of work would include the demolition of Building 12-034 and the associated ramp (buildings 12-034SS, 12-R-034, and 12-019P). …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to replace existing Structures 0/5 and 5/7 on its Flatiron to Dixon …
Western Area Power Administration (WAPA), Rocky MountainRegion (RMR), proposes to conduct routine vegetation management along its Ault – Craig (AU-…
The project aims to deliver a safe, effective, low cost solution to assist with the monetization of economically stranded resources via subsea well…
B3 Reactor Laboratory permits the operation of three reactor systems. High Performance Reactor 1, High Performance Reactor 2, and the Multi Impurit…
Remove portions of existing guardrails, conduit, and conduit support, and remove ladder on 249-H.…
Implement modifications to Building 751-1A that include drilling into transite to mount photoluminescent exit signs and to relocate an electricalre…
Subcontractor will provide roof repairs at Building 703-10B.…
Remove existing guardrails and ladder on 234-H. Install an aluminum ladder that meets OSHA and NFPA 101 requirements.…
Activities to support Tank Farm and DWPF with qualification of Sludge Batch 10.…