This EC revision includes a handful of scope additions. …
The latest capability upgrade requirement is to add LTE Band 4 and Band 5 capability to the existing Wireless Test Bed (WTB) LTE Network. To implem…
The proposed work activity is to remove a recent modification from the Advanced Test Reactor (ATR) Control room air conditioner, 670-HVA-2. The mod…
Award Number: DE-EE0008390, CX(s) Applied: A9, Wind Energy Technologies Office, Location(s): NY, Office(s): Golden Field Office
Award Number: DE-EE0008834, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): OH, Office(s): Golden Field Office
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is not required.…
Install riprap on the upstream slope of Par Pond Dam between the existing riprap and the guard rail. …
This EEC covers all Site Services preventative and corrective maintenance activities that have the potential to disturb gasket materials.…
This EEC covers all Site Services preventative and corrective maintenance work that has the potential to disturb presumed asbestos containingmateri…
This EEC covers all Site Services excavation work activities at SRS when it has been determined that a CERCLA O-M Plan is required.…