The north medium bay roll-up door on Building 717-F no longer functions. The north medium bay roll-up door will be replaced, including the door, do…
The men’s rest room has flooded and caused floor damage in Bathroom Trailer 704-73E requiring floor replacement for entire trailer. Construction wi…
The Subcontractor will install one (1) 3" drain insert, flash dry drain insert in with one (1) 4' X 4' modified patch, and seal perimeter of patch…
Clean/vacuum precipitator hopper and extension auger. Wood ash will be delivered to Three Rivers Landfill under a special waste manifest. Rinse wa…
The Subcontractor will re-attach all loose metal and replace screws with oversized screws. Repair entire perimeter, front and back with hydro-stop …
The Subcontractor will install new sheet metal flashing between roof eave and the awning, install new foam closure in the same location as the shee…
The Analytical Development group will use the Agilent Inductively Coupled Plasma Emission Spectrometer to perform elemental analysis on liquid samp…
Award Number: DE-EE0008500CX(s) Applied: A9, B3.6Bioenergy Technologies OfficeLocation(s): ILOffice(s): Golden Field Office
CX-019626: Establishing Modular In-Chamber Electron Beam Welding – Electric Power Research Institute
The Electric Power Research Institute proposes to develop a Modular In-Chamber Electron Beam Welding approach that can be used to join large-diamet…
The original scope of work involved the demolition of Building 11-15A and the associated ramp (11-015y). The scope of work has been revised to incl…