Install backboards in phone room in 722-A.…
Augusta Industrial to pressure wash internal cooling tower basins at 785-1B and 785-A.…
Subcontractor will provide roof repairs at 704-16B.…
Room 169 is being modified to accommodate office spaces throughout the room, resulting in deficient notification device coverage as required byNFPA…
Replace the packing in Return Pump #3 at 281-2H.…
Building 616-G has reached an end state and will be demolished.…
The proposed action relocates electrical equipment and outlets, work benches, cabinets, and equipment and removes a 14-foot sheetrock partition wa…
The project will leverage existing design and analysis knowledge for additive materials and methods to develop and refine designs for advanced turb…