Remove suspect asbestos gaskets on discharge line at 905-103F.…
This work supports HB area by including, dissolution, separation/purification of Pu/Np solutions which may contain Pu, U, Fe, etc., via ion exchang…
Americium will be electrodeposited onto a solid substrate from an acidic media. …
The scope of work would involve the demolition of office Buildings 12-101, 12-102, and 12-107. The scope of work also involves the restoration of t…
A Non-Time Critical Removal Action will consist of an emulsified oil permeable barrier. Trees and vegetation will be cleared and lay-down areas cre…
Replace existing sidewalk on the north side of Buildings 7-11.…
Bonneville Power Administration proposes to reconfigure the Fords Prairie Tap line, including the sectionalizing switches, near Chehalis, Lewis Cou…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing wooden H-frame structures along its Box Butte S…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to approve a request by Black Hills Corporation (Black Hills) to re…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance of the existing access roads along a…