The Geomechanics and Flow Lab will combine three previously permitted NETL labs: GGSCFL, Degradation of Wellbore Cements Due to CO2 Injection, and …
BPA proposes to fund the Colville Confederated Tribe (CCT) to construct instream structures [Beaver Dam Analogs and Post Assisted Log Structures] a…
In the Application, as relevant here, DECP asks DOE/FE to extend its 20-year export term in Order No. 3331-A to a term ending on December 31, 2050.
In the Application, as relevant here, Calcasieu Pass asks DOE/FE to extend its 20-year export term in Order No. 4346 to a term ending on December 2050
In the Application, as relevant here, Rio Grande LNG asks DOE/FE to extend its 20-year export term in Order No. 4492 to a term ending on December 2050
In the Application, as relevant here, Plaquemines LNG asks DOE/FE to extend its 20-year export term in Order No. 4446 to a term ending on December 31,
LM is proposing a 1-day visit to the Chariot, Alaska, Site to install four institutional control (IC) markers.…
The proposed activity will involve removing the currently approved palletized operations on the CCO pad to utilize a rack system for horizontal con…
An initial engineering design study for carbon capture plant for an ethanol facility.…
The project will test a CO2 elective membrane on a slip stream of flue gas from a coal-fired plant.…