A commercial vacuum induction furnace, Centorr System VII, will be used to make metallic samples using molds.…
The project will reconfigure the plant power supply and distribution system to transition to a more adequately sized 138kV supply.…
The purpose of the project is to upgrade the power distribution system in TAN-1617 to include optional emergency power. …
Award Number: DE-EE0009063, CX(s) Applied: A9, B3.6, Building Technologies Office, Location(s): MD, Office(s): Golden Field Office
Award Number: DE-EE0009134, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): TN, Office(s): Golden Field Office
BPA proposes to provide funding to the Luckiamute Watershed Council (LWC) to implement a floodplain reconnection project.…
BPA preposes to replace deteriorating wood pole structures and any associated hardware and guys in the Olympia TLM Maintenance District.…
The Fischer-Tropsch Synthesis, gaseous-phase reaction, will be performed in stainless steel vessels and reaction products analyzed by gas chromatog…
Various glass, ceramic and composite materials are routinely fabricated and characterized at the Aiken County Technical Laboratory, Building 999-1W…
Empty Shipping Containers require annual maintenance and testing to ensure the container meets all SARP requirements.…