Under the award, INL and IOS will further develop the IOS laser ultrasound fuel rod inspection system.…
This is an evaluation of the proposed NIOWAVE treatment process of degraded 30 percent tributyl phosphate (TBP)/70 percent dodecane solvent.…
Excavate to expose damaged sewer pipe. Repair/replace pipe.…
Restroom trailers 742-10G and 742-11G built in 1993 (519 square feet each) will have services disconnected, and the trailers will be removed from t…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
Construction Personnel will dismantle and remove Building 701-35H.…
The University of California, Berkeley proposes to develop novel chemical approaches to separate lanthanide and actinide elements under advanced so…
For this project, the UXO mitigation strategy is to blow-in-place (to destroy the UXO in place at the incident location) the warhead.…
BPA proposes to remove, replace, upgrade, and modify electronic equipment as the need arises at existing buildings throughout the BPA service ter…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…