This EEC covers the removal of the inlet HEPA Filters and the respective housings that were used to support Cabinet 25 operations in F091.…
Establish a field location and install a 10-year field experiment to simulate and study the movement of radiounuclides through an artificial vadose…
High winds from a recent storm damaged a covered deck between buildings 22 and 23 within the MOX Complex Area.…
BPA proposes to allow US Gypsum to install ground wire along an existing gas pipeline on BPA ROW that parallels BPA’s Paul-Allston No. 1 transmiss…
BPA proposes to fund the Willamette Riverkeeper to implement two vegetation management projects in Marion County.…
Award Number: DE-EE0009039, CX(s) Applied: A9, B5.1, Federal Energy Management Program, Location(s): KY, Office(s): Golden Field Office
Award Number: DE-EE0009037, CX(s) Applied: A9, B5.1, Federal Energy Management Program, Location(s): KY, Office(s): Golden Field Office
Award Number: DE-EE0009109, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): MI, Office(s): Golden Field Office
Spectrum LNG, LLC application to export domestically produced LNG in a volume equivalent to 2.3 Bcf/yr) of natural gas for a two-year term
BPA proposes to replace the dead end tower insulators on both Chief Joseph-Snohomish No.3 and No. 4 transmission lines. …