Replace the current aboveground wellhead portion of the vertical monitoring wells at the Hallam, Nebraska, Decommissioned Reactor Site, with flush-…
LM is proposing to remove and replace the backup power supply generator at the Legacy Management Business Center (LMBC) in Morgantown, West Virgini…
In the Application, as relevant here, CCL Stage III asks DOE/FE to extend its 20-year export term in Order No. 4490 to a term ending on December 2050
722-N, Remove Damaged Floor Tiles in Lunchroom and Dispose of Properly.…
766-H Flood Damage Repair…
Installation of Video Telecommunications in 730-2B Conference Room 332.…
Install Video Telecommunications in 703-47A Room 128.…
The project would design, manufacture, and field test a hybrid Direct Air Capture system that would capture CO2 and water from air. This work inclu…
Synthesize and evaluate adsorbent, fabricate lab scale vacuum swing adsorption (VSA) test device,and conduct performance testing. This project invo…
The REPAIR Program seeks to develop natural gas transmission pipeline retrofitting technology to rehabilitate existing cast iron and bare steel pip…