Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine vegetation management along its Beaver Creek-Ste…
In the Application, as relevant here, ECA asks DOE/FE to extend its 20-year export term in Order No. 4365 to a term ending on December 31, 2050.…
In the Application, as relevant here, Texas LNG asks DOE/FE to extend its 20-year export term in Order No. 4489 to a term ending on December 31, 20…
In the Application, as relevant here, ECA Liquefaction asks DOE/FE to extend its 20-year export term in Order No. 4364 to a term ending on December…
703-A Room 28 Water damage repairs…
The rainfall from a recent hurricane flooded the area adjacent to the Southwest corner of Vault 4, which caused legacy radioactive soil/crusher run…
Due to a demand for portable power in F-Tank Farm, 2 Diesel Generators have recently been processed for eligibility in our Reciprocating Internal C…
A strainer is needed on the intake piping of the M1 Purge Water Disposal Station (PWDS) to remove any debris from the ACP purge water trucks.…
Activity is to replace the current restroom trailer with a new restroom trailer in the same location.…
Reconfigure electrical drops and install UW drops in new cubes in 730-4B Room 135.…