The primary scope of this project is to replace the existing Materials and Fuels Complex (MFC) industrial wastewater pipeline flume with a new flum…
Office of NEPA Policy and Compliance
November 15, 2021The primary scope of this project is to replace the existing Materials and Fuels Complex (MFC) industrial wastewater pipeline flume with a new flume designed for accurate measurements over the entire range of expected flows within the pipeline.