BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to monitor bull trout (Salvelinus confluentus) populations w…
The overall project goal is to perform a Phase I study (i.e., conceptual design study) for integration of a 10 MWh Compressed Natural Gas Energy St…
To design the mechanical system, build and test a compressor stage for hydrogen service, applicable to integration with new and existing fossil fue…
The objective of this project is for the Clean Cities Coalition to provide technical assistance and outreach, participate in program meetings, and …
Award Number: DE-EE0009242, CX(s) Applied: A9, B1.31, B3.6, Fuel Cell Technologies Office, Location(s): TN, Office(s): Golden Field Office
The Massachusetts Institute of Technology (MIT), in collaboration with the University of Michigan, University of Buffalo, Argonne National Laborato…
Install lights and A/C unit in seatrain.…
Remove exterior awning and install new Carrier 20-Ton HVAC Unit at building 725-2N (Paint Barn).…
Remove and excess 2 welding machines and 1 plasma cutter from building 711-1F.…
Understanding the mechanical response of materials under radiation is essential to qualifying any material for use within a reactor.…