The Advanced Test Reactor Complex machine shop, building TRA-662, contains old machines/equipment that need to be removed and sent to excess proper…
BPA proposes to make modifications to the parking area at Raver Substation.…
This project will support efforts to develop, demonstrate, and deploy cyber and cyber-physical solutions for utilities. This review only covers R a…
NETL, University of West Virginia, Gaia Energy Research Institute, NASA/WV facility data center and Velocity Data Centers will potentially advance …
The major outcome will potentially be a syngas cleanup train demonstrated to yield a coal syngas capable of sustaining SOFC performance equal to th…
Demo/removal of the windows/panels on the east wall of Building 83 at the NETL Pittsburgh Site and the replacement of these windows/panels with a c…
The most schedule and cost effective solution for INL's future mission is to convert operation and management of existing telecommunication transpo…
This project replaces the existing, retired #4 Boiler, located in the boiler house (Kesselring Site (KS) Building 8), with a new boiler and sub-syste
BPA proposes to remove a tree that has fallen on the 13.8-kilovolt double-circuit Big Cliff-Detroit PH 1-2 No. 1 and No. 2 transmission lines betwe…
DOE LM is proposing administrative actions related to Defense-Related Uranium Mine safeguarding activities on Abandoned Mine Lands.…