Restroom trailers 742-10G and 742-11G built in 1993 (519 square feet each) will have services disconnected, and the trailers will be removed from t…
At the A-Area Burning/Rubble Pits and Rubble Pit (731-A, -1A, and -2A)/Miscellaneous Chemical Basin/Metals Burning Pit (731-4A and -5A) Operable Un…
Construction Personnel will dismantle and remove Building 701-35H.…
The University of California, Berkeley proposes to develop novel chemical approaches to separate lanthanide and actinide elements under advanced so…
For this project, the UXO mitigation strategy is to blow-in-place (to destroy the UXO in place at the incident location) the warhead.…
BPA proposes to remove, replace, upgrade, and modify electronic equipment as the need arises at existing buildings throughout the BPA service ter…
Electical receptacles to be installed in the Clerk and Shift Managers Offices in Building 105-K.…
Replace the existing Carbon Steel Nitrogen Exhaust Line for the SAS glovebox with Stainless Steel Piping and remove the old Dewar manifold.…
Install a permanent ventilation system for the Sodium Nitrite Makeup Tank (SNMUT) to allow tank to vent directly to the atmosphere at the 422-S roo…
Replace the old monitoring system with new technology (laser flow sensor) at the H-02 Outfall.…