Carbon capture plant initial engineering analysis (pre-FEED) design will be completed.…
Remove existing roof layers of Building 6 (except roof decking) and replace with new roofing materials.…
BPA proposes to allow Washington County to pave an approximately 48-square-foot section of its Keeler-Oregon City No. 2 and Oregon City-Stub-C tran…
Award Number: DE-EE00008279, CX(s) Applied: A9, B1.15, B5.5, B5.21, State Energy Program, Location(s): AL, Office(s): Golden Field Office
Site construction will prep and paint the curbs and traffic stripping around the exterior of 735-4B.…
The Li'l Critter pump in building 723-A is used for pressure testing. Replacement of the Hydraulic Oil and process fluid in the Li'l critter pump i…
This EEC covers various general renovations for buildings 725-N, 725-1N, and 725-2N in Central Shops. This revision includes the installation of ad…
Laser sensor mounted on culvert to measure stream flow at A-11 Outfall culvert.…
Develop and evaluate novel nickelate based oxygen electrodes which show potential for high performance and durability in both electrolysis and fuel…
The objective is to develop two advanced materials, metal organic frameworks (MOFs) and phosphorous dendrimers, for direct air capture of carbon di…