This work package provides the electrical scope to troubleshoot and repair ELLV-PNL-A to include associated breakers and wiring damaged in building…
Evaluation of slurry characteristics and operation of a small entrained-flow gasifier (Recipient). Open air test firing of hot oxygen burner withou…
Setup and testing of sorbent material for incorporation into the offgas mitigation train of the Mobile Melter Consolidation (MMC) effort.…
Remove the south rail stop from the 105-L transfer bay area.…
Remodel room 405 in the K-Reactor Building.…
Existing Effluent Discharge Pumps will be removed from service and pump No. 1 will be replaced with a new more reliable pump.…
Award Number: DE-EE0009419, CX(s) Applied: A9, B3.6, Advanced Manufacturing Office, Location(s): CA, Office(s): Golden Field Office
Award Number: DE-EE0008895, CX(s) Applied: A9, A11, B3.6, B5.15, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office
Award Number: DE-EE0009294, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): IA, Office(s): Golden Field Office
Award Number: DE-EE0008636, CX(s) Applied: A9, B3.6, Water Power Technologies Office, Location(s): FL, Office(s): Golden Field Office