Two year project would develop a novel CO2 capture technology based on a deep eutectic solvent.…
Award Number: DE-EE0009272, CX(s) Applied: A9, B3.6, Bioenergy Technologies Office, Location(s): CA, Office(s): Golden Field Office
Establishment and operation of a Rapid COVID Testing Station outside of 735-4B.…
Dismantle and remove 210-S Control Room Chiller No. 1 (EN/EP No. S-210-580-010-00) and 210-S Control Room Chiller No. 2 (EN/EP No. S-210-580-015-00…
707-F Patch sheetrock/repaint rooms 6 and 8.…
The obsolete recloser on B Feeder is reaching the end of its life cycle and need to be replaced…
Modifications to receptacles and panels in Building 702-A.…
Install voice only drop in Building 766-H.…
Install additional roof security barriers to the Main Tritium Entry Control Facility (Building 701-3H).…
Several passive fire protection features in Building 233-H have deficiencies which could potentially degrade their performance in the event of a fi…