BPA proposes to perform in-kind replacement of wood pole structure 9/4 and associated structural/electrical components (e.g., cross arms, insulator…
BPA proposes to fund the Washington Department of Fish and Wildlife (WDFW) to repair a section of the Sandhill Road in the Bridgeport Unit of the S…
BPA proposes to perform in-kind replacement of two damaged culverts in the Spokane TLM District. The proposed action would reduce the risk of an ac…
The Special Nuclear Material test bed (Beartooth) is a R and D test bed that will contain the necessary unit operations for the dissolution, separa…
Western Area Power Administration, Sierra Nevada Region (WAPA) is responsible for the operation and maintenance of several federally owned and oper…
The proposed work installs safety-related displays of the NRCQDP that meets design basis requirements for the Plant Protection System (PPS) in the …
Southern LNG seeks to re-export this LNG by vessel from the Elba Island Terminal (SLNG Terminal), located in Chatham County, Georgia, to any country with which the United States does not have a free trade agreement (FTA) requiring national treatment for..
This project would expand the productions areas at Ml-8.…
In this project, we will develop a new class of battery separators to fill the market gap and facilitate the development of new battery chemistries…
Award Number: DE-EE0008895, CX(s) Applied: A9, A11, B3.6, B3.16, B5.15, Water Power Technologies Office, Location(s): OR, Office(s): Golden Field Office