This project will provide a new exhaust system (2 Fans), a small electrical building, a stack, and a new diesel generator for 234-7H and will blank…
Remove Asbestos Presumed Asbestos Containing Material (PACM) gaskets, then remove leaking valve RWW-101 and replace with new valve, reinstall insul…
Modified SOPO, addition of Lucid Energy, field work (monitoring) at two sites, the acquisition of core and geophysical logs, and the acquisition of…
Haynes 282 samples prepared using additive manufacturing of wire-arc technique will be analyzed through microstructure analysis and mechanical test…
Laboratory scale experimental testing and validation, report and manuscript writing and submitting.…
Produce transformational and scalable manufacturing building materials from domestic coal derived pyrolyzed char (PC) and solvent extracted coal de…
Award Number: DE-AC36-08GO28308, CX(s) Applied: B3.2, NREL, Location(s): CO, Office(s): Golden Field Office
Award Number: DE-EE0009249, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): CA, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to complete Stage 04 maintenance at its Poncha (PON)…
USG No. 112 has requested the use of INL and surrounding areas to conduct radio frequency (RF) testing and research.…