This activity is for completion of Safe Shutdown thru Phase 1 Deactivation of 237-H/238-H/238-1H facilities.…
This activity is for completing deactivation of the 236-H By-Product Facility.…
This task designs, constructs, and tests an electrically heated test loop similar to the reactor reference design to investigate the thermal perfor…
This revision includes addition of two tasks to the ongoing research activities performed at the Energy Innovation Laboratory (EIL) labs B208 and C…
Award Number: DE-EE0009250, CX(s) Applied: A9, B3.6, Fuel Cell Technologies Office, Location(s): MO, Office(s): Golden Field Office
BPA proposes to allow an applicant to park and operate a mobile food truck on BPA fee-owned right-of-way (ROW) near structure 5/9 on the Ross-Carbo…
Office work
BPA proposes to replace the existing 2.5-inch expanded line conductor on the John Day Powerhouse-John Day No. 1 through 4 transmission lines from s…
Removal of water, soil, and gravel will be required along with necessary repairs to prevent future wash-outs.…
Replace HT-TCAP Hydride Beds in Building 233-H.…