704-1N carpet replacement.…
In the Application, as relevant here, Eagle LNG asks DOE/FE to extend its 20-year export term in Order No. 4445 to a term ending on December 31, 20…
In the Application, Eagle Maxville asks DOE/FE to extend its 20-year export term in Order No. 4078 to a term ending on December 31, 2050.…
The Recipient will scale up kW-class advanced oxygen-free electrolyzer technology to 10-kW level and test it under simulated syngas conditions deri…
In the Application, as relevant here, Southern LNG asks DOE/FE to extend its 20-year export term in Order No. 3956 to a term ending on December 31,…
In the Application, Annova asks DOE/FE to extend its 20-year export term in Order No. 4491 to a term ending on December 31, 2050.…
In the Application, as relevant here, Cameron LNG asks DOE/FE to extend its 20-year export terms in Order Nos. 3391-A, 3797, and 3846 (as amended) …
Design, build, operate mineral oil flow loop. Develop final field test plan, obtain required paper work/certs by subcontractor, cert data Acq syste…
This project shall update the existing TRA 670 Advanced Test Reactor Criticality (ATR) Heating Ventilation and Air Conditioning (HVAC) system, whic…
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to conduct routine maintenance to one structure on its Hesperus-Wat…