Add electrical outlets at Centerra Stations in corridor outside E and I Office per Work Instructions and E-DCF-L-00523.…
The PA removes and replaces the complete Environmental Chamber system units No. 2 (LSS.002), 3 (LSS.003), 1 (LSS.001), and 10 (LSS.010) in the 234-…
A Subcontractor shall provide Savannah River Nuclear Solutions (SRNS) Railroad Operations with a locomotive for the planned work scope across the S…
Install and anchor pipe bender at 711-N.…
This revision includes additional scope of work involving “Drop In Capsule Irradiation Design and Analysis”.…
LANL Plutonium oxide samples are prepared via closed vessel hot block dissolution and aliquoted for impurity analyses.…
This EEC covers analytical methods for Radiochemical Measurements.…
218-1H LED Lights Upgrade…
Installing new power pole for the SOM desk in 234-H.…
Install eight new water table monitoring wells at ELLWF.…