Receiving and storing COVID-19 vaccines at 719-5N Site Medical and establishment and operation of a COVID-19 Vaccine administering station in 766-H…
Installation of D-Area groundwater monitoring wells for data collection.…
This modification will transition all of the head-end components of the E3S Closed Circuit TV system to IVAS.…
K-Area Steam System Quench Chamber Visual Check/Clean Out/Repair.…
Construction of Pre-manufactured Modular Offices and Restroom Building Near CCO Storage Pad, K-Area. This space is needed for personnel supporting …
BPA proposes to install a single span of conductor on structure 5/6 of BPA’s Biglow Canyon-John Day No 1 transmission line.…
CX(s) Applied: A9, A11, Advanced Manufacturing Office, Location(s): Multiple, Office(s): Golden Field Office
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 1 through 18 on the Snake Creek-Box …
Western Area Power Administration (WAPA), Rocky Mountain Region (RMR), proposes to replace existing Structures 29/2 through 30/1 on the Archer-Steg…
This study will enable the investigation of thermally driven phenomena that governs the microstructural evolution of nuclear materials by tailoring…