Pending the completion of renovation activities in 773-A, B-147/151 Analytical Development Section (ADS) will install and operate an Agilent 7700x …
Office renovations in building 704-71S. Renovations will take place in rooms 4A and 5 including wall installation/repair, door installation, floori…
Replacement of 3M Soil Vapor Extraction Unit (SVEU) Stack GCAS-STK-305…
WAPA proposes to perform all removal of the existing antennas, dehydrators and waveguides and installation of the new antennas, dehydrators and wav…
BPA proposes to fund the Blue Mountain Land Trust through the Confederated Tribes of the Umatilla Indian Reservation to purchase a conservation eas…
BPA proposes to fund the Columbia River Inter-Tribal Fish Commission (CRITFC) to monitor and sample Columbia River Zone 6 tribal fisheries (platfor…
BPA proposes to fund the Confederated Tribes of the Warm Springs Reservation of Oregon to monitor bull trout (Salvelinus confluentus) populations w…
The overall project goal is to perform a Phase I study (i.e., conceptual design study) for integration of a 10 MWh Compressed Natural Gas Energy St…
To design the mechanical system, build and test a compressor stage for hydrogen service, applicable to integration with new and existing fossil fue…
The objective of this project is for the Clean Cities Coalition to provide technical assistance and outreach, participate in program meetings, and …